[01]
Forgotten PM
Preventive tasks are forgotten or delayed, increasing unexpected failures and costly emergency repairs.
Preventive MaintenancePreventive MaintenancePreventive Maintenance
Prepare every PM with its procedure, planned parts, owner, and timing. Keep the completed record with the asset to improve the next job.
The Challenge
[01]
Preventive tasks are forgotten or delayed, increasing unexpected failures and costly emergency repairs.
[02]
Without clear ownership, maintenance requests are delayed, disrupting production.
[03]
Without centralized schedules and reporting, it's difficult to understand asset health or maintenance performance.
[04]
Maintenance requests disappear across emails, calls, and paper forms, delaying response times.
The solution
[Automate]
[Execute]
[Improve]
Core capabilities
Recurring schedules
Set calendar, runtime, or condition-based intervals for recurring work.
Meter-based maintenance
Let floor readings trigger service at the right meter value.
Automatic work orders
Create and assign work automatically when each PM is due.
Procedure library
Build once, control revisions, and apply procedures to the right assets.
PM compliance
See what was completed on time, what slipped, and where.
Repeat-failure analysis
Find recurring failures and adjust intervals, procedures, or planned parts.
We used to lose hours tracking down parts across spreadsheets and storerooms. Canary gave us real-time visibility into every part, every location. Stockouts dropped, carrying costs fell, and our technicians finally have what they need when they need it.
Daria Simonova
Director of Operations, ABB Woods
Blogs and Articles

A practical guide to a CMMS workflow for manufacturing: define the job, prepare the people and materials, coordinate the shift, and record the return to service.

A practical guide to stronger asset history: capture the context behind maintenance work, separate symptoms from causes, and use follow-up to improve the next decision.

A field-ready routine for confirming the asset, reviewing prepared work, recording what changed, and handing off useful closeout.
Enterprise ready