Skip to main content
G2 rating: 4.8 out of 5 stars

Built for teams that can’t afford downtime.

Connect every asset, understand every signal, and automate maintenance with enterprise-grade AI.

The Canary dashboard on a laptop, with a work order open on a phone beside it

Customer logos and illustrative wordmarks

ABB Wood BrazilBRAVEN WORKSNORTHLINEPSW Pack & Stack WoodsFERROVARIDGE & RAILFORMWELL

Sensors + CMMS

Early warning. Ready work. Reliable equipment. Know which asset needs attention. Give your team the parts, procedures, and plan to act.

01

Detect

02

Prepare

03

Repair

how teams use canary

Keep your operation running.

Catch failures early.

Turn vibration and temperature alerts into planned maintenance.

Keep equipment running longer.

Plan preventive maintenance around equipment condition and service history.

Keep every site on track.

Coordinate work orders, parts, and schedules across your sites.

Give technicians answers on the job.

Find procedures, manuals, and asset history with Ask Canary.

The work behind uptime

Make planned maintenance the way you work.

See the workflow

01

Prepare the work. Bring parts, procedures, and ownership together before work starts.

02

Protect the schedule. See team capacity and conflicts before publishing the schedule.

03

Act on asset condition. Use schedules and asset condition to decide what happens next.

04

Keep PMs on track. Give recurring work an owner, a due date, and follow-through.

Works with tools you already use

50+ IntegrationsCustom enterprise connectorsWebhookOpen APIsMCPs

Connect everything

With 50+ Integrations, bring ERP, MES, IoT, and enterprise tools as operational context.

Understand anything

Unify operational data into AI-ready context through APIs and MCP.

Automate Everywhere

Unify operational data into AI-ready context through APIs and MCP.
Illustrative overhead view of a timber-processing line with lumber and roller conveyors
PSW Pack & Stack Woods
Case studies

PSW Pack & Stack Woods

Less downtime. More jobs on time.

Case study · Timber processing

Paper logs and repeat breakdowns were pushing production behind schedule.

Less downtime
31%
On time
90%

Maintenance guides

Practical guides for maintenance teams

Learn more

Enterprise ready

Reduce Downtime. Increase Throughput.Scale with Canary

Schedule a demo